Design-construction works of new tramway to Tallinn Airport
Client: Tallinna Linnatranspordi AS
Contract period: 03.11.2015 – 15.11.2017
Construction Cost: 11 475 253, 70 EUR excl. VAT
According to the agreement, the following works will be executed:
– Design works;
– New tramway from Ülemiste railway station area to airport will be constructed;
– A tunnel below Ülemiste railway area and Suur-Sõjamäe street will be built;
– Entire infrastructure necessary for the operation of a new tram line (traction substation, contact lines, power cables, etc.) will be constructed;
– Protection of existing utility networks / re-positioning and deployment of new networks as necessary.
Other important notes: KMG Inseneriehituse AS in a consortium with Merko Ehitus Eesti AS will carry out all of the above design and construction work