Reconstruction of pier no.1 in Kuivastu harbor
Joint venture with Raunopol AS
Construction period:2009-2010
FIDIC contract. 75% financed by EU.
Construction cost – 650 000 eur (excl. VAT)
Berthing line length – ca 123 m, water depth at quay line – 5,2 m. The bottom of aquatorium covered with concrete plates at width of 21 m. Water supply and power supply.