Muuga’s harbor industrial park railway
Client: AS Tallinna Sadam
Construction period: May 2012 – January 2013
Construction cost: 2 367 628, 86 EUR excl. VAT
According to the agreement, following works will be executed:
– Reconstruction of connection route nr 8 and track nr 10
– Construction works of connection route nr 701
– Construction works of station sidings nr 702, 705, 710 with switches nr 4, 705, 706, 711 with the total length of 1, 56 km
– Electrical centralization of switches nr 705 and 706
– Digging works for around 79 000 m³ (63 000 m³ for the railway construction and around 16 000 m³ for making drains, trenches and collector)
Other important notes: Procurement number 130365