{"id":937,"date":"2021-04-20T08:14:56","date_gmt":"2021-04-20T08:14:56","guid":{"rendered":"https:\/\/kmg-ee.vserver.zonevs.eu\/objects\/vanasadama-kai-nr-16-kaldarambi-ehitamine-koos-kaide-nr-14-15-ja-16-sildumisvarustuse-ja-elektrivarustuse-rekonstrueerimisega\/"},"modified":"2024-09-06T09:46:39","modified_gmt":"2024-09-06T06:46:39","slug":"construction-of-tallinn-old-port-quay-no-16-shore-ramp","status":"publish","type":"objects","link":"https:\/\/www.kmg.ee\/en\/objects\/construction-of-tallinn-old-port-quay-no-16-shore-ramp\/","title":{"rendered":"Construction of quay no. 16 of Vanasadama"},"content":{"rendered":"\n<p class=\"wp-el\"><strong>Client<\/strong>:\u00a0Tallinn Sadam AS<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Contract Period:<\/strong>\u00a0November 2014 \u2013 June 2015<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Construction Cost<\/strong>:&nbsp;1 991 150 EUR &nbsp;<sub><sup>(ex VAT)<\/sup><\/sub><\/p>\n\n\n\n<p class=\"wp-el\"><strong>Capacity Information:\u00a0<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Construction of a ramp with a reinforced concrete superstructure resting on piles (plan dimensions 31 x 28.5m.) and a steel bridge with an adjustable height of the Vanasadam Pier No. 16.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>The ramp is designed for boarding and disembarking transport vehicles transported by ships.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Installation of electrical supply, lighting, steel bridge lifting mechanism on the ramp, with control devices, spring protection, and rescue equipment.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of the fender protection on the mooring line of quays No. 14, 15, and 16.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Construction of reinforced concrete braces, installation of bracing systems with two conical braces and UHMW-PE cover and steel panel (17 sets). Construction of tower bollards (6 pcs.) to secure ships to the quayside.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of the electrical supply of berths 14, 15, and 16.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Installation of new electrical panels (6 pcs.), cable lines, and communication cables in the quay channel.<br>Also new reinforced concrete slabs for channel cover.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Preparation of necessary construction and product drawings.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\"><\/ul>\n\n\n\n<p class=\"wp-el\"><\/p>\n\n\n<div id=\"acf-block_8df1bd96ca74f32f50921678c56bb4d5\" class=\"gallery d-flex flex-wrap\"><div class=\"gallery-item\"><a href=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0631_large.jpeg\" class=\"d-block position-relative\"><img loading=\"lazy\" decoding=\"async\" width=\"170\" height=\"170\" src=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0631_large-170x170.jpeg\" class=\"attachment-img-170 size-img-170\" alt=\"\" srcset=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0631_large-170x170.jpeg 170w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0631_large-80x80.jpeg 80w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0631_large-120x120.jpeg 120w\" sizes=\"auto, (max-width: 170px) 100vw, 170px\" \/><\/a><\/div><div class=\"gallery-item\"><a href=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0619-1_large.jpeg\" class=\"d-block position-relative\"><img loading=\"lazy\" decoding=\"async\" width=\"170\" height=\"170\" src=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0619-1_large-170x170.jpeg\" class=\"attachment-img-170 size-img-170\" alt=\"\" srcset=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0619-1_large-170x170.jpeg 170w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0619-1_large-80x80.jpeg 80w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0619-1_large-120x120.jpeg 120w\" sizes=\"auto, (max-width: 170px) 100vw, 170px\" \/><\/a><\/div><div class=\"gallery-item\"><a href=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0553_large.jpeg\" class=\"d-block position-relative\"><img loading=\"lazy\" decoding=\"async\" width=\"170\" height=\"170\" src=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0553_large-170x170.jpeg\" class=\"attachment-img-170 size-img-170\" alt=\"\" srcset=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0553_large-170x170.jpeg 170w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0553_large-80x80.jpeg 80w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0553_large-120x120.jpeg 120w\" sizes=\"auto, (max-width: 170px) 100vw, 170px\" \/><\/a><\/div><div class=\"gallery-item\"><a href=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0581_large.jpeg\" class=\"d-block position-relative\"><img loading=\"lazy\" decoding=\"async\" width=\"170\" height=\"170\" src=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0581_large-170x170.jpeg\" class=\"attachment-img-170 size-img-170\" alt=\"\" srcset=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0581_large-170x170.jpeg 170w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0581_large-80x80.jpeg 80w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0581_large-120x120.jpeg 120w\" sizes=\"auto, (max-width: 170px) 100vw, 170px\" \/><\/a><\/div><div class=\"gallery-item\"><a href=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0529_large.jpeg\" class=\"d-block position-relative\"><img loading=\"lazy\" decoding=\"async\" width=\"170\" height=\"170\" src=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0529_large-170x170.jpeg\" class=\"attachment-img-170 size-img-170\" alt=\"\" srcset=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0529_large-170x170.jpeg 170w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0529_large-80x80.jpeg 80w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0529_large-120x120.jpeg 120w\" sizes=\"auto, (max-width: 170px) 100vw, 170px\" \/><\/a><\/div><div class=\"gallery-item\"><a href=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0312_large.jpeg\" class=\"d-block position-relative\"><img loading=\"lazy\" decoding=\"async\" width=\"170\" height=\"170\" src=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0312_large-170x170.jpeg\" class=\"attachment-img-170 size-img-170\" alt=\"\" srcset=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0312_large-170x170.jpeg 170w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0312_large-80x80.jpeg 80w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2021\/04\/DSC_0312_large-120x120.jpeg 120w\" sizes=\"auto, (max-width: 170px) 100vw, 170px\" \/><\/a><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>A concrete shore ramp (measuring 31&#215;28,5m) founded on steel tube piles will be built the ramp has adjustable steel structure. The ramp will be used for loading and off-loading of vehicles from ships.<\/p>\n","protected":false},"featured_media":772,"template":"","object-category":[22],"class_list":["post-937","objects","type-objects","status-publish","has-post-thumbnail","hentry","object-category-completed"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects\/937","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects"}],"about":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/types\/objects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media\/772"}],"wp:attachment":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media?parent=937"}],"wp:term":[{"taxonomy":"object-category","embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/object-category?post=937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}