{"id":931,"date":"2021-04-20T08:46:27","date_gmt":"2021-04-20T08:46:27","guid":{"rendered":"https:\/\/kmg-ee.vserver.zonevs.eu\/objects\/tallinna-lennujaama-lennuliiklusala-keskkonnaseisundi-parendamine-ja-lennuohutuse-suurendamine-ii-ehitusetapp\/"},"modified":"2024-09-06T09:42:52","modified_gmt":"2024-09-06T06:42:52","slug":"improvement-of-the-environment-and-aviation-safety-of-the-tallinn-airport-airside-area-ii-stage","status":"publish","type":"objects","link":"https:\/\/www.kmg.ee\/en\/objects\/improvement-of-the-environment-and-aviation-safety-of-the-tallinn-airport-airside-area-ii-stage\/","title":{"rendered":"Improvement of the environmental condition of Tallinn Airport airside area"},"content":{"rendered":"\n<p class=\"wp-el\"><strong>Client: <\/strong>AS Tallinn Airport<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Contract Period:<\/strong>&nbsp;May 2020 \u2013 December 2021<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Construction Cost:<\/strong>&nbsp;24 800 000 EUR <sub><sup>(ex VAT)<\/sup><\/sub><\/p>\n\n\n\n<p class=\"wp-el\"><strong>Capacity Information:&nbsp;<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Extension of the apron in the southern area of \u200b\u200bthe airport.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Installation of rainwater systems,&nbsp; to alleviate excess water problems on the eastern side of the flight area.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Construction of a drainage system for snow collection&nbsp;areas.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Upgrading the configuration of the eastern de-icing area to increase runway capacity<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>The&nbsp;construction of the aircraft engine testing area, including compliant noise barriers<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Construction of airfield access and perimeter roads, construction of the southern ring road<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Airfield AGL construction and integration into Air traffic control systems (TWR) and navigational systems<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Implementing CAT II compliance of the airport<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-el\"><strong><br><br>Other Notes:&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-el\">Joint tender with Verston Ehitus O\u00dc.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Client: AS Tallinn Airport Contract Period:&nbsp;May 2020 \u2013 December 2021 Construction Cost:&nbsp;24 800 000 EUR (ex VAT) Capacity Information:&nbsp; Other&#8230;<\/p>\n","protected":false},"featured_media":979,"template":"","object-category":[22],"class_list":["post-931","objects","type-objects","status-publish","has-post-thumbnail","hentry","object-category-completed"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects\/931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects"}],"about":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/types\/objects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media\/979"}],"wp:attachment":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media?parent=931"}],"wp:term":[{"taxonomy":"object-category","embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/object-category?post=931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}