{"id":923,"date":"2021-04-20T07:01:51","date_gmt":"2021-04-20T07:01:51","guid":{"rendered":"https:\/\/kmg-ee.vserver.zonevs.eu\/objects\/jaakreostuse-likvideerimine-endistel-sojavae-ja-toostusaladel-projekteerimis-ehitustood-miinisadam-susta-tn-sadam\/"},"modified":"2025-06-02T13:40:20","modified_gmt":"2025-06-02T10:40:20","slug":"jaakreostuse-likvideerimine-endistel-sojavae-ja-toostusaladel-projekteerimis-ehitustood-miinisadam-susta-tn-sadam","status":"publish","type":"objects","link":"https:\/\/www.kmg.ee\/en\/objects\/jaakreostuse-likvideerimine-endistel-sojavae-ja-toostusaladel-projekteerimis-ehitustood-miinisadam-susta-tn-sadam\/","title":{"rendered":"Residual contamination liquidation in former military and indrustial areas"},"content":{"rendered":"\n<p class=\"wp-el\"><strong>Client:&nbsp;<\/strong>Keskkonnateabe keskus<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Contract Period:<\/strong>&nbsp;April 2011 &#8211; October 2012<\/p>\n\n\n\n<p class=\"wp-el\"><strong><strong>Construction Cost:<\/strong><\/strong>&nbsp;1 128 580 EUR&nbsp;<sub><sup>(ex VAT)<\/sup><\/sub><\/p>\n\n\n\n<p class=\"wp-el\"><strong>Capacity Information:&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-el\">Execution of waste pollution elimination works in the Miinisadama and S\u00fcsta St area. The general goal of the project is the localization of residual pollution that threatens groundwater, prevention of environmental pollution, and elimination of residual pollution.<\/p>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Moving contaminated soil, subsequent treatment, or depositing it in an appropriate landfill.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Demolition of facilities subject to liquidation in polluted areas and handling of generated waste (reuse or disposal).<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Elimination of high vegetation in the area with polluted soil (if necessary).<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Improvement of cleaned areas, and restoration of their good condition.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Operational implementation of the monitoring system for studies following pollution elimination.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>The total volume of earthworks is approximately 21,000 m<sup>3<\/sup>.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-el\"><\/p>\n\n\n\n<p class=\"wp-el\">The total volume of earthworks is approximately 1000 m3. In addition to this, cleaning of polluted water, liquidation of oil residues, demolition work, and construction of a composting area.<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Other Notes:&nbsp;<\/strong><\/p>\n\n\n\n<p class=\"wp-el\">Joint tender with the Finnish company Biomaa OY, Kesto O\u00dc, and Epler &amp; Lorenz AS.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>J\u00e4\u00e4kreostuse likvideerimist\u00f6\u00f6de teostamine Miinisadama ja S\u00fcsta tn sadama territooriumidel.<\/p>\n","protected":false},"featured_media":1373,"template":"","object-category":[22],"class_list":["post-923","objects","type-objects","status-publish","has-post-thumbnail","hentry","object-category-completed"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects\/923","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects"}],"about":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/types\/objects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media\/1373"}],"wp:attachment":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media?parent=923"}],"wp:term":[{"taxonomy":"object-category","embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/object-category?post=923"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}