{"id":919,"date":"2021-04-20T07:24:25","date_gmt":"2021-04-20T07:24:25","guid":{"rendered":"https:\/\/kmg-ee.vserver.zonevs.eu\/objects\/rakke-alevikus-rekonstrueeritakse-amortiseerunud-torustikud-puurkaevus-pumplad-ja-reoveepuhastid-ning-laiendatakse-vee-ja-kanalisatsioonisusteeme\/"},"modified":"2024-09-06T10:10:13","modified_gmt":"2024-09-06T07:10:13","slug":"reconstruction-of-the-amortized-piping-driven-wells-pumping-stations-and-water-treatment-plants-in-the-parish-of-rakke","status":"publish","type":"objects","link":"https:\/\/www.kmg.ee\/en\/objects\/reconstruction-of-the-amortized-piping-driven-wells-pumping-stations-and-water-treatment-plants-in-the-parish-of-rakke\/","title":{"rendered":"Reconstruction of the pumping stations and water treatment plants in the borough of Rakke"},"content":{"rendered":"\n<p class=\"wp-el\"><strong>Client:<\/strong>&nbsp;Rakke Valla Kommunaalasutus<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Construction Period:<\/strong>&nbsp;February 2012- June 2013<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Construction Cost:<\/strong>&nbsp;1 729 020 EUR &nbsp;<sub><sup>(ex VAT)<\/sup><\/sub><\/p>\n\n\n\n<p class=\"wp-el\"><strong>Capacity Information:&nbsp;<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of 2.9km. of drinking water pipeline and construction of 0.3km.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of 0.5km. of self-flowing sewage pipeline and construction of 1.8km.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of 1.7km. of pressure sewerage pipeline and construction of 0.5km.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of two drinking water wellbore pump stations.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of 2 sewage pumping stations and construction of 3.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of one wastewater treatment plant.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Construction and reconnection of water and wastewater connection points for properties.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-el\"><strong>Other Notes<\/strong>: <\/p>\n\n\n\n<p class=\"wp-el\">Joint tender with Viimsi Keevitus AS<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Client:&nbsp;Rakke Valla Kommunaalasutus Construction Period:&nbsp;February 2012- June 2013 Construction Cost:&nbsp;1 729 020 EUR &nbsp;(ex VAT) Capacity Information:&nbsp; Other Notes: Joint&#8230;<\/p>\n","protected":false},"featured_media":162,"template":"","object-category":[22],"class_list":["post-919","objects","type-objects","status-publish","has-post-thumbnail","hentry","object-category-completed"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects\/919","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects"}],"about":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/types\/objects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media\/162"}],"wp:attachment":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media?parent=919"}],"wp:term":[{"taxonomy":"object-category","embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/object-category?post=919"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}