{"id":918,"date":"2021-04-20T07:25:20","date_gmt":"2021-04-20T07:25:20","guid":{"rendered":"https:\/\/kmg-ee.vserver.zonevs.eu\/objects\/vinni-valla-veemajandusprojekti-vee-ja-kanalisatsioonitorustike-ning-puurkaevude-rekonstrueerimise-projekteerimis-ehitustood-osa-i-vetiku-viru-jaagupi-ja-roela\/"},"modified":"2024-09-05T11:26:24","modified_gmt":"2024-09-05T08:26:24","slug":"vinni-parish-water-and-sewage-pipelines-and-borewells-reconstruction","status":"publish","type":"objects","link":"https:\/\/www.kmg.ee\/en\/objects\/vinni-parish-water-and-sewage-pipelines-and-borewells-reconstruction\/","title":{"rendered":"Reconstruction of water and sewage pipelines and boreholes in Vinni Municipality"},"content":{"rendered":"\n<p class=\"wp-el\"><strong>Client:<\/strong>&nbsp;Vinni Vallavalitsus<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Construction period<\/strong>: March 2012- March 2013<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Construction cost<\/strong>: 1 092 370 EUR<sub><sup> (ex VAT)<\/sup><\/sub><\/p>\n\n\n\n<p class=\"wp-el\"><strong>Capacity information:\u00a0<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of approx. 2.07 km of water pipelines and approx. 60 house connections.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of approx. 1.21 km of sewage pipelines and approx. 26 house connection.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of ca. 0.085 km pressure sewerage pipelines.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of two wellbore pump stations, and installation of water treatment equipment.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Construction of one new replacement wellbore pump station, as well as installation of water treatment equipment on it.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Demolition of two old pump stations (Roela borough).<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Reconstruction of three sewage pumping stations.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Procurement of a control computer for the remote monitoring system of Vinni Municipality, together with the necessary software and accessories.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Switching to a remote monitoring system of existing and newly constructed water and sewage systems.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-el\"><strong>Other notes<\/strong>: <\/p>\n\n\n\n<p class=\"wp-el\">Joint tender with Viimsi Keevitus AS and Lemmink\u00e4inen Eesti AS.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Client:&nbsp;Vinni Vallavalitsus Construction period: March 2012- March 2013 Construction cost: 1 092 370 EUR (ex VAT) Capacity information:\u00a0 Other notes:&#8230;<\/p>\n","protected":false},"featured_media":162,"template":"","object-category":[22],"class_list":["post-918","objects","type-objects","status-publish","has-post-thumbnail","hentry","object-category-completed"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects\/918","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects"}],"about":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/types\/objects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media\/162"}],"wp:attachment":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media?parent=918"}],"wp:term":[{"taxonomy":"object-category","embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/object-category?post=918"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}