{"id":1554,"date":"2024-09-11T13:37:46","date_gmt":"2024-09-11T10:37:46","guid":{"rendered":"https:\/\/www.kmg.ee\/?post_type=objects&#038;p=1554"},"modified":"2025-01-23T12:58:39","modified_gmt":"2025-01-23T09:58:39","slug":"the-rail-baltica-soodevahe-infrastructure-phase-i","status":"publish","type":"objects","link":"https:\/\/www.kmg.ee\/en\/objects\/the-rail-baltica-soodevahe-infrastructure-phase-i\/","title":{"rendered":"The Rail Baltica Soodevahe infrastructure, phase I"},"content":{"rendered":"\n<p class=\"wp-el\"><strong>Client<\/strong>: Rail Baltic Estonia O\u00dc<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Contract Period:&nbsp;<\/strong>September 2023 &#8211; December 2024<\/p>\n\n\n\n<p class=\"wp-el\"><strong>Construction Cost: <\/strong>4 616 000 EUR <sub><sup>(ex VAT)<\/sup><\/sub><\/p>\n\n\n\n<p class=\"wp-el\"><strong>Capacity Information<\/strong>:<\/p>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>The infrastructure of the first stage of the construction of the maintenance Center<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list wp-el\">\n<li>Material warehouse preparations<\/li>\n<\/ul>\n\n\n<div id=\"acf-block_09de4eee00197740d10997ee1d78d21b\" class=\"gallery d-flex flex-wrap\"><div class=\"gallery-item\"><a href=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2024\/03\/Olev-MIhkelmaa_022-1200x674.jpg\" class=\"d-block position-relative\"><img loading=\"lazy\" decoding=\"async\" width=\"170\" height=\"170\" src=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2024\/03\/Olev-MIhkelmaa_022-170x170.jpg\" class=\"attachment-img-170 size-img-170\" alt=\"\" srcset=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2024\/03\/Olev-MIhkelmaa_022-170x170.jpg 170w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2024\/03\/Olev-MIhkelmaa_022-80x80.jpg 80w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2024\/03\/Olev-MIhkelmaa_022-120x120.jpg 120w\" sizes=\"auto, (max-width: 170px) 100vw, 170px\" \/><\/a><\/div><div class=\"gallery-item\"><a href=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2024\/03\/Olev-MIhkelmaa_001-1200x674.jpg\" class=\"d-block position-relative\"><img loading=\"lazy\" decoding=\"async\" width=\"170\" height=\"170\" src=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2024\/03\/Olev-MIhkelmaa_001-170x170.jpg\" class=\"attachment-img-170 size-img-170\" alt=\"\" srcset=\"https:\/\/www.kmg.ee\/wp-content\/uploads\/2024\/03\/Olev-MIhkelmaa_001-170x170.jpg 170w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2024\/03\/Olev-MIhkelmaa_001-80x80.jpg 80w, https:\/\/www.kmg.ee\/wp-content\/uploads\/2024\/03\/Olev-MIhkelmaa_001-120x120.jpg 120w\" sizes=\"auto, (max-width: 170px) 100vw, 170px\" \/><\/a><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Client: Rail Baltic Estonia O\u00dc Contract Period:&nbsp;September 2023 &#8211; December 2024 Construction Cost: 4 616 000 EUR (ex VAT) Capacity&#8230;<\/p>\n","protected":false},"featured_media":1568,"template":"","object-category":[22],"class_list":["post-1554","objects","type-objects","status-publish","has-post-thumbnail","hentry","object-category-completed"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects\/1554","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/objects"}],"about":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/types\/objects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media\/1568"}],"wp:attachment":[{"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/media?parent=1554"}],"wp:term":[{"taxonomy":"object-category","embeddable":true,"href":"https:\/\/www.kmg.ee\/en\/wp-json\/wp\/v2\/object-category?post=1554"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}