The works include the manufacturing, supply and installation of a new shore ramp including the necessary piling and concrete works.
The length of quay number 4 is 145 m, interconnection length is going to be 130 m, and guaranteed deepness of the water is 5,2m.
The size on metal shore ramp is 9,0 x 15,6 m. Seabed dredging volume is 2650 m3.
Existing quay walk on wooden fascine mattress is protected with reinforced concrete plates.
The volume of erosion protection plate is 1670/ 680 m²/m³.
Underneath the ramp a granite embankment protection will be constructed with a volume of 1220 m³.
The lightning of the quay is renewed, head distribution center and ships' switchboard are going to be installed.
The ships' wastewater receiving unit it built.
Existing quay equipment is going to be changed for fitting plate fenders according to the given type of ferries, additional bollards are installed.
The cost of contract: 1 343 777, 17 EUR excl. VAT
The construction period: 180 days.