The contract period is 548 days.
The Approved contract amount is 3 331 271,38 EUR without VAT 20%..
The contract content:
The residual liquidation works execution Holstre-Nõmme ABT and Umbsaare ABT territories. The overall objective of the project is a residual risk of groundwater pollution sources localization, environmental pollution prevention and elimination of residual waste. The works result must be achieved by the following objectives:
1. Removal of contaminated soil exceeding normative values (see decrees from the minister of environment of 11th of august 2010 nr 38 "Hazardous substances limit values in soil " (RTL 18.08.2010, 57, 373)), it’s treatment or storage in a landfill foreseen for such a use;
2. Polluted areas of the liquidation facilities demolition and waste management (recycling or disposal);
3. Polluted soil at high landscaping liquidation (if necessary);
4. Cleaned areas of repair, restore them in good condition;
5. Implementation of a monitoring system to carry out investigations after the completion of the works.
The general conditions of contract are „ Conditions of Contract for Plant & Design-Build (First Ed, 1999). For Electrical & Mech. Plant & For Building & Engineering Works Designed by the Contractor, First edition 1999 (FIDIC „Yellow book“)“.
KMG Inseneriehituse AS project manager is Jaan Valtin